Our work
Kwinana Energy Recovery
Phronis Consulting provided onshore engineering support for the Kwinana Energy Recovery Facility in Western Australia — Australia’s first large-scale thermal waste-to-energy (W2E) plant. The facility processes 460,000 tonnes per year of residual waste and generates 38MW of baseload electricity for the Western Australian grid.

Biogas Projects
Phronis supported two anaerobic digestion projects that processed food waste streams to produce biomethane for power generation and gas grid connection. The projects utilised both tank-based and lagoon-based digesters (including Covered Anaerobic Lagoons (CAL)), with our role spanning project management, plant layout, process support, costings, procurement and electrical connection concepts.

Gympie Waste Options Strategy
Phronis supported Gympie Regional Council in addressing emerging landfill management pressures by developing a strategic reference document. The document consolidated current thinking on waste disposal and landfill reduction options, providing a structured framework to guide short, medium and long-term decision-making discussions.

Chichester Solar Farm
Phronis provided design and delivery leadership for the civil and structural components of a 60MW Solar PV power station in the Pilbara, including associated transmission lines and substation works. Our scope covered switching stations, benches, access roads, drainage, erosion and sediment control, and site administration structures through to Issued for Construction documentation.

Nothing matched your search. Contact our team for the full selection of projects